Water: Claimed vs Actual
Open database of water pollution, spills, depletion, and false restoration. Verified via satellite data. No source — no publication.
Global Water Projects (IFI Tracker)
Track water-related projects funded by International Financial Institutions (IFIs). If a project is approved but shows no satellite-verified progress, it belongs on our Gap Map.
Central Asia (CA)
| Institution | Project | Focus | Link |
|---|---|---|---|
| World Bank | Central Asia Water Efficiency Cooperation (CAWEC) | Transboundary water efficiency ($20M IDA Grant) | View Project → |
| World Bank | Uzbekistan National Irrigation & Energy Efficiency (NIEEIP) | Irrigation modernization ($200M) | View Project → |
| ADB | Glaciers to Farms (Central Asia) | Climate adaptation for glacier-fed basins ($3.25B program) | View Program → |
| ADB | Yesil River Basin Solutions (Kazakhstan) | Flood risk reduction & dam safety | View Project → |
| EBRD | Resilient Water Systems (Kyrgyz Republic & Tajikistan) | Climate-resilient water supply (€100M EBRD + €55M GCF) | View Program → |
| EBRD | Kulob Water & Wastewater (Tajikistan) | Clean water access for 100,000+ people (€6.2M) | View Project → |
| EcoAudit CA | Modular Composite Pipe Plants (Uzbekistan) | Trunk main replacement & water loss reduction ($523M/yr) | Read Report → |
| EcoAudit CA | Modular Composite Pipe Plants (Kazakhstan) | Drinking water losses & economic justification ($892M/yr) | Read Report → |
| EcoAudit CA | Modular Composite Pipe Plants (Kyrgyzstan) | Drinking water losses & economic justification ($200M/yr) | Read Report → |
Global / Other Regions
| Institution | Project | Focus | Link |
|---|---|---|---|
| World Bank | Water Efficiency and Conservation MPA (Multi-Region) | Regional water efficiency framework | View Framework → |
| IMF | Uzbekistan PIMA with Climate Module | Public investment management for water/climate | View Report → |
| EcoAudit CA | Preliminary Report: Waste Oil Burning (Uzbekistan) | Emissions & damage assessment ($150M–$1.2B) | Read Report → |
🟢 New Report: Systemic Water Supply Problems & Composite Pipes (Uzbekistan)
Economic justification for replacing worn-out trunk mains and transitioning to local production of composite pipes. Estimated annual benefit: $523M+ with 12 modular plants.
Read Full Report (EN) →🟢 New Report: Drinking Water Losses & Modular Pipes (Kazakhstan)
Analysis of contradictory data (6.8% official vs 20% actual) and economic justification for 20 modular plants. Estimated annual benefit: $892M.
Read Full Report (EN) →🟢 New Report: Drinking Water Losses & Modular Pipes (Kyrgyzstan)
Every fourth cubic meter is lost. Economic justification for 9 modular plants to address 80% network wear. Estimated annual benefit: $200M.
Read Full Report (EN) →🔴 Report: Waste Oil Burning in Uzbekistan
Preliminary environmental assessment of emissions and damage from burning waste oils in boilers and greenhouses. Estimated damage: $150M – $1.2B. Includes official inspection data and media coverage.
Read Full Report (EN) →Support Verification
We accept contributions to cover satellite monitoring and legal defense. Public wallets, multisig, on-chain route.
View Tokens & Pay →
Water Ecology Map