Preliminary Environmental Report

"Burning of Waste Oils in Boilers and Greenhouses: Emission and Environmental Damage Assessment for Uzbekistan"
Classification: For Internal Official Use
Prepared by: "EcoAudit-Central Asia" Expert Group (independent, unofficial)
Date: November 14, 2026
Status: Preliminary (calculated, no field measurements)

1. Basis and Purpose

This report was prepared by an expert group based on:

Purpose: to provide an order-of-magnitude damage estimate where official calculations are absent, and to propose short-term solutions.

2. Initial Balance Hypothesis (Working Assumption)

StreamShareMass, t/year
Burning (boilers, greenhouses, illegal)50%125,000
Discharge to soil/water/sewer30%75,000
Unaccounted collection (unknown location)20%50,000
Total100%250,000
Caveat: This is an estimated hypothesis, not confirmed by official collection statistics.

3. Emission Calculation from Burning 125,000 t of Oil

PollutantEmission FactorEmissions, t/year
CO₂2.9 t/t oil362,500
PM (particulate matter)~8.55 kg/t~1,069
PM-10~7.56 kg/t~945
NOx~2.11 kg/t~264
SO₂ (at S=1%)~0.143 kg/t~18
CO~0.278 kg/t~35
Lead (at 0.1% Pb)~0.0067 kg/t~0.84

4. Damage Assessment (International Rates)

4.1. Burning

ComponentLower EstimateUpper Estimate
CO₂ (market $21/t → SCC $1,013/t)~$7.6M~$367M
PM/PM-10 (EPA $150,000–840,000/t)~$142M~$794M
NOx (EPA $5,800–20,000/t)~$1.5M~$5.3M
Total Burning~$151M~$1.17B

4.2. Discharge of 75,000 t to Soil/Water

There are no direct international "tariffs." The lower bound based on soil treatment cost (~$1/t) is ~$75,000, but this does not account for groundwater migration or health impacts. A realistic range cannot be determined without monitoring data.

4.3. Unaccounted 50,000 t

Not assessed. Conservatively, this could be attributed to burning or discharge, increasing the total by 20–40%.

5. Summary Conclusion on Damage

ScenarioDamage Estimate (Burning)
Lower bound~$150M
Upper bound~$1.2B
Discharge to soil/waterNot determined (no data)
Even the lower bound demonstrates a scale of damage that is orders of magnitude higher than the cost of installing filters and organizing collection.

6. Short-Term Solutions

6.1. Conversion to Biodiesel with Pre-Treatment

Waste oil, after pre-treatment (filtration, removal of water and mechanical impurities, neutralization), can be processed into biodiesel. This:

6.2. Mini-Plant Deployment Scheme

ParameterValue
Regions12
Plants per region6
Total plants72
Capacity per plant1 t/day
Total capacity72 t/day
Annual processing volume (350 days)~25,200 t/year

6.3. Environmental Effect

Processing ~25,000 t/year of waste oil instead of burning/discharging:

Note: 25,000 t is about 10% of total oil generation (250,000 t) and about 20% of the burning stream (125,000 t). The effect is real but does not fully close the problem.

7. Brief Calculation for All of Uzbekistan

7.1. Initial Data (Same Hypothesis)

The calculation fully coincides with Section 3, since 125,000 t is already the national estimate of the burning stream.

7.2. Emissions and Damage from Burning (National Scale)

ComponentEmissions, t/yearDamage (Lower)Damage (Upper)
CO₂~362,500~$7.6M~$367M
PM/PM-10~1,069 / ~945~$142M~$794M
NOx~264~$1.5M~$5.3M
Total—~$151M~$1.17B

7.3. Discharge of 75,000 t

Without groundwater monitoring data, this cannot be determined. The lower bound based on soil treatment cost (~$1/t) gives only ~$75,000, which is clearly underestimated.

7.4. Comparison with the Mini-Plant Solution

The scheme of 72 plants × 1 t/day = ~25,200 t/year processes:

To cover at least half of the burning stream, ~170 plants would be required, and even more with discharge included.

7.5. National Conclusion (Brief)

The theoretical damage from burning at the national scale is from ~$150M to ~$1.2B. Discharge to soil/water is not assessed due to lack of data. The 72 mini-plant scheme covers no more than 10% of total oil generation. Real reduction of damage requires expanding the collection network, field emission measurements, and phased scaling of processing.

8. Recommendations for Companies (Short-Term, 0–12 Months)

  1. Greenhouse farms and boiler houses: install particulate/gas filters on existing boilers; stop burning waste oil, tires, bitumen, and fuel oil; conclude contracts for waste oil removal with licensed collectors.
  2. Collectors and processors: organize oil collection points in each district; implement pre-treatment of oil before biodiesel conversion; launch pilot mini-plants (1 t/day) in 2–3 districts to refine the scheme.
  3. Service and transport companies: hand over waste oil only under contract, with transfer acts; maintain records of oil generation and transfer.
  4. Investors and mini-plant operators: replicate modular plants according to the 12 regions × 6 plants scheme; ensure pre-treatment of feedstock for stable biodiesel yield.

9. Limitations and Caveats

  1. This calculation is not official and cannot be used for legal claims.
  2. Emission factors are taken from international reference books, not from measurements on Uzbek boilers.
  3. The 50/30/20 balance hypothesis is an estimate.
  4. Damage from discharge to groundwater is not calculated due to lack of monitoring data.
  5. The 72 plants × 1 t/day scheme is illustrative; actual productivity depends on collection logistics and feedstock quality.
  6. Exchange rate for conversion to UZS: 1 USD = 12,014.37 UZS (Central Bank of Uzbekistan, 14.11.2026).

10. Next Steps (Internal)

  1. Request actual collection volumes from Uz-Prista Recycling for 2020–2025 to verify the balance.
  2. Initiate field measurements of emissions from greenhouse boilers (PM, NOx, SO₂, Pb).
  3. Conduct soil and groundwater sampling in areas of mass burning.
  4. Launch a pilot mini-plant (1 t/day) and measure actual biodiesel yield after pre-treatment.
  5. After obtaining data, recalculate the report using national methodologies.

11. Official Inspections & Media Coverage (Context)

The following official inspections and media reports illustrate the regulatory context and enforcement actions related to environmental violations in Uzbekistan (2026).

October 2026 — National Committee on Ecology and Climate Change: Disciplinary Actions

An expanded meeting chaired by Aziz Abdukhakimov criticized deficiencies in environmental control. Heads of the Andijan, Namangan, and Khorezm regional ecology departments were dismissed. Issues included inadequate monitoring equipment integration and failure to act on citizen complaints.

Source: Hukumat.uz (RU) →

October 2026 — Illegal Wastewater Discharge in Tashkent Region

Environmental Police raids in Yukorichirchiq District found enterprises (B.S.I., M.K., P.U., Sh.R.B., S.S.P.) discharging untreated industrial wastewater onto open land. Suspended solids exceeded standards several times. Materials were forwarded to law enforcement.

Source: Hukumat.uz (EN) →

October 2026 — Chirchiq River Pollution (Red Water Incident)

Following social media reports of red water in the Chirchiq River, inspections at the Chirchiq treatment plant (Toshkent viloyati suv ta'minoti JSC) revealed treatment efficiency of only 27.7%. Untreated wastewater from Gazalkent was discharged directly into the river. Compensation claims were calculated and materials sent to law enforcement.

Source: Hukumat.uz (RU) →

July 2026 — Salar Canal Sewage Discharge

A damaged sewer pipeline during construction by B.B. LLC led to 63,936 m³ of liquid waste being pumped into the Salar Canal. Laboratory tests showed petroleum products 5.02x the limit, ammonium nitrogen 43.5x, and COD 4.9x. Total environmental compensation: UZS 2.22 billion.

Source: Gov.uz (EN) →

March 2026 — New Eco-Police Leadership Appointed

Fazliddin Salomov was appointed Deputy Chairman of the National Committee on Ecology and Climate Change and Deputy Head of the State Environmental Control Inspectorate (Eco-Police), reinforcing institutional capacity for environmental enforcement.

Source: Kun.uz (UZ) →

Signed: "EcoAudit-Central Asia" Group

"We count what others don't"

This report is analytical and calculative in nature. All figures are estimates, except where reference coefficients are explicitly stated.