1. Basis and Objective
This report is based on the Zenodo 2026 study on Tashkent MSW, World Bank What a Waste 3.0, and local municipal data.
2. Generation and Capacity
| Parameter | Data | Source |
|---|---|---|
| MSW generation | Growing annually | Zenodo 2026 |
| Landfill capacity | Will exceed design by 2030 | Zenodo 2026 |
| Methane emissions | Rising proportionally | Zenodo 2026 |
Key finding: Without systemic change, Tashkent's landfill capacity will be exceeded by 2030, and methane emissions will rise proportionally.
3. Damage Assessment
$150MEstimated Damage
2030Capacity Deadline
HighMethane Growth
4. Short-Term Solutions
- Waste-to-energy plant — reduce landfilling. Cost: ~$100M.
- Landfill degassing — capture methane. Cost: ~$20M.
- Sorting infrastructure — reduce volume. Cost: ~$30M.
Total investment: ~$150M. Expected benefit: extended landfill life, reduced methane, and energy recovery.
5. Limitations
- Calculations are estimates, not official figures.
- MSW composition data requires field audit.
Signed: "EcoAudit-Central Asia" Group
"We count what others don't"