Bishkek Waste-to-Energy — Kyrgyzstan

Positive example: old landfill reclaimed, new plant operational. Preliminary Environmental Report.

Prepared byEcoAudit-Central Asia
Date18 November 2026
StatusPreliminary (positive example)
Verified Positive Example

1. Basis and Objective

This report is based on Kabar (2025) and field data from Bishkek Municipality.

2. Plant Overview

ParameterDataSource
MSW input1,000 t/dayKabar 2025
Plant capacity1,200 t/dayKabar 2025
Electricity output~30 MWKabar 2025
Ash useConstruction materialsKabar 2025
Old landfillFully reclaimedKabar 2025
Why this is a positive example: Bishkek closed its old landfill, built a waste-to-energy plant that processes 1,000 t/day and generates ~30 MW, and uses ash for construction materials. The old landfill is fully reclaimed.

3. Damage Assessment

$0Damage (Avoided)
30 MWClean Power
ReclaimedOld Landfill

4. Replication Potential

5. Limitations

  1. Ash contains heavy metals; monitoring needed.
  2. WtE is not a substitute for recycling.

Signed: "EcoAudit-Central Asia" Group

"We count what others don't"