1. Basis and Objective
This report is based on Kabar (2025) and field data from Bishkek Municipality.
2. Plant Overview
| Parameter | Data | Source |
|---|---|---|
| MSW input | 1,000 t/day | Kabar 2025 |
| Plant capacity | 1,200 t/day | Kabar 2025 |
| Electricity output | ~30 MW | Kabar 2025 |
| Ash use | Construction materials | Kabar 2025 |
| Old landfill | Fully reclaimed | Kabar 2025 |
Why this is a positive example: Bishkek closed its old landfill, built a waste-to-energy plant that processes 1,000 t/day and generates ~30 MW, and uses ash for construction materials. The old landfill is fully reclaimed.
3. Damage Assessment
$0Damage (Avoided)
30 MWClean Power
ReclaimedOld Landfill
4. Replication Potential
- Replicate model in other CA cities — reduce landfilling. Cost: ~$150M per city.
- Ash reuse in construction — circular economy.
5. Limitations
- Ash contains heavy metals; monitoring needed.
- WtE is not a substitute for recycling.
Signed: "EcoAudit-Central Asia" Group