1. Basis and Objective

This report is based on open data from Global Energy Monitor, Climate TRACE, and Ember, combined with regional assessments.

2. Facility Overview

Turkmenistan's power sector is almost entirely gas-fired. Many plants are Soviet-era with low efficiency. Location (centroid): 37.95, 58.38.

3. Key Findings

ParameterDataSource
Fuel typeGas (almost 100%)GEM
Plant efficiencyLow (Soviet-era)Climate TRACE
Upstream methaneHigh leakageTROPOMI
Key finding: Gas-dependent generation with inefficient plants and high upstream methane leakage means the climate benefit of gas is partially or fully offset.

4. Damage Assessment

$1BEstimated Damage
100%Gas Share
HighMethane Leakage

5. Short-Term Solutions

Total investment: ~$350M. Expected benefit: lower emissions per MWh, reduced methane leakage, and improved export potential.

6. Limitations

  1. Calculations are estimates, not official figures.