1. Basis and Objective
This report is based on the World Bank project document (P174323) and project evaluation data.
2. Facility Overview
Syrdarya 2 CCGT is a combined-cycle gas turbine plant in Uzbekistan. Location: 40.85, 68.66. It is a World Bank-financed project with carbon benefits.
3. Key Findings (Positive)
| Parameter | Data | Source |
|---|---|---|
| EIRR (with carbon benefits) | 9.3% | World Bank P174323 |
| Baseline | Coal-based generation avoided | World Bank |
| Efficiency | Combined-cycle (high) | World Bank |
Why this is a positive example: The project avoids higher-emission baseline generation and demonstrates that gas can be part of a transition strategy when used efficiently (CCGT) and without leakage.
4. Damage Assessment
$0Damage (Avoided)
9.3%EIRR (with carbon)
CCGTEfficiency
5. Replication Potential
- Replicate CCGT model in other regions — lower carbon intensity. Cost: ~$500M per plant.
- Address upstream methane leakage — to ensure gas benefits are real.
6. Limitations
- Upstream methane leakage modeled separately.
- Long-term gas lock-in risk remains.
Signed: "EcoAudit-Central Asia" Group