Nurek Hydropower Plant — Tajikistan

Positive example: clean hydropower and rehabilitation benefits. Preliminary Environmental Report.

Prepared byEcoAudit-Central Asia
Date16 November 2026
StatusPreliminary (positive example)
Verified Positive Example

1. Basis and Objective

This report is based on the World Bank project document (P173804) and project evaluation data.

2. Facility Overview

Nurek Hydropower Plant is the largest hydroelectric plant in Tajikistan and one of the largest in Central Asia. Location: 38.37, 69.35.

3. Key Findings (Positive)

ParameterDataSource
Net CO₂e reduction69 million tonnesWorld Bank P173804
Economic NPV$2.08 billionWorld Bank
Units9 (rehabilitation)World Bank
Why this is a positive example: Hydropower provides low-carbon electricity. Rehabilitation of existing units increases clean output without new environmental impact.

4. Damage Assessment

$0Damage (Avoided)
69 MtCO₂e Reduced
$2.08BNPV

5. Replication Potential

6. Limitations

  1. Methane from reservoir not quantified.
  2. Climate change impacts on glacier-fed hydrology remain a risk.

Signed: "EcoAudit-Central Asia" Group

"We count what others don't"