1. Basis and Objective
This report is based on the facility's own environmental reports for Q4 2025, regulatory data, and local media coverage (BAQ.KZ, 2026).
2. Facility Overview
Ekibastuz GRES-1 (named after Bulat Nurzhanov) is one of Kazakhstan's largest coal-fired power plants. Location: 51.87, 75.30. It burns high-ash coal from the Ekibastuz basin.
3. Emissions and Violations
| Parameter | Data | Source |
|---|---|---|
| Q4 2025 emissions | 60,110 t (limit: 62,361 t) | Environmental Report Q4 2025 |
| CO exceedances | Documented | Regulatory data |
| Unauthorized waste accumulation | Documented | Regulatory data |
| Citizen complaints | Ash fallout reported | BAQ.KZ 2026 |
Key finding: Despite formal compliance with the quarterly limit, the plant has documented CO exceedances and unauthorized waste accumulation. The absence of gas-phase purification means SO₂/NOx are not captured.
4. Damage Assessment
$500MEstimated Damage
High-ash coalFuel Type
AbsentGas Purification
5. Short-Term Solutions
- Install gas-phase purification — capture SO₂/NOx (currently absent). Cost: ~$150M.
- Ash collection system upgrade — reduce PM emissions. Cost: ~$30M.
Total investment: ~$180M. Expected benefit: reduced health costs, compliance with future regulations, and fewer citizen complaints.
6. Limitations
- Calculations are estimates, not official figures.
- Emission factors from international references.
- Exact damage to health requires epidemiological study.
Signed: "EcoAudit-Central Asia" Group