1. Basis and Objective

This report is based on the facility's own environmental reports for Q4 2025, regulatory data, and local media coverage (BAQ.KZ, 2026).

2. Facility Overview

Ekibastuz GRES-1 (named after Bulat Nurzhanov) is one of Kazakhstan's largest coal-fired power plants. Location: 51.87, 75.30. It burns high-ash coal from the Ekibastuz basin.

3. Emissions and Violations

ParameterDataSource
Q4 2025 emissions60,110 t (limit: 62,361 t)Environmental Report Q4 2025
CO exceedancesDocumentedRegulatory data
Unauthorized waste accumulationDocumentedRegulatory data
Citizen complaintsAsh fallout reportedBAQ.KZ 2026
Key finding: Despite formal compliance with the quarterly limit, the plant has documented CO exceedances and unauthorized waste accumulation. The absence of gas-phase purification means SO₂/NOx are not captured.

4. Damage Assessment

$500MEstimated Damage
High-ash coalFuel Type
AbsentGas Purification

5. Short-Term Solutions

Total investment: ~$180M. Expected benefit: reduced health costs, compliance with future regulations, and fewer citizen complaints.

6. Limitations

  1. Calculations are estimates, not official figures.
  2. Emission factors from international references.
  3. Exact damage to health requires epidemiological study.

Signed: "EcoAudit-Central Asia" Group

"We count what others don't"