1. Basis and Objective
This report has been prepared on the basis of:
- open data from raids by the Special Environmental Commission (December 2025);
- estimates of waste oil generation in Uzbekistan (~250,000 t/year);
- international reference emission factors (EPA, IPCC, Japanese methodology for waste oil);
- international damage cost estimates (market CO₂ price, SCC, EPA rates for PM/NOx/SO₂).
Purpose: to provide an order-of-magnitude damage estimate where official calculations are absent, and to propose short-term solutions.
2. Initial Balance Hypothesis (Working Assumption)
| Stream | Share | Mass, t/year |
|---|---|---|
| Burning (boilers, greenhouses, illegal) | 50% | 125,000 |
| Discharge to soil/water/sewer | 30% | 75,000 |
| Unaccounted collection (unknown location) | 20% | 50,000 |
| Total | 100% | 250,000 |
3. Emission Calculation from Burning 125,000 t of Oil
| Pollutant | Emission Factor | Emissions, t/year |
|---|---|---|
| CO₂ | 2.9 t/t oil | 362,500 |
| PM (particulate matter) | ~8.55 kg/t | ~1,069 |
| PM-10 | ~7.56 kg/t | ~945 |
| NOx | ~2.11 kg/t | ~264 |
| SO₂ (at S=1%) | ~0.143 kg/t | ~18 |
| CO | ~0.278 kg/t | ~35 |
| Lead (at 0.1% Pb) | ~0.0067 kg/t | ~0.84 |
4. Damage Assessment (International Rates)
4.1. Burning
| Component | Lower Estimate | Upper Estimate |
|---|---|---|
| CO₂ (market $21/t → SCC $1,013/t) | ~$7.6M | ~$367M |
| PM/PM-10 (EPA $150,000–840,000/t) | ~$142M | ~$794M |
| NOx (EPA $5,800–20,000/t) | ~$1.5M | ~$5.3M |
| Total Burning | ~$151M | ~$1.17B |
4.2. Discharge of 75,000 t to Soil/Water
There are no direct international "tariffs." The lower bound based on soil treatment cost (~$1/t) is ~$75,000, but this does not account for groundwater migration or health impacts.
4.3. Unaccounted 50,000 t
Not assessed. Conservatively, this could be attributed to burning or discharge, increasing the total by 20–40%.
5. Summary Conclusion on Damage
| Scenario | Damage Estimate (Burning) |
|---|---|
| Lower bound | ~$150M |
| Upper bound | ~$1.2B |
| Discharge to soil/water | Not determined (no data) |
6. Short-Term Solutions
6.1. Conversion to Biodiesel with Pre-Treatment
Waste oil, after pre-treatment (filtration, removal of water and mechanical impurities, neutralization), can be processed into biodiesel.
6.2. Mini-Plant Deployment Scheme
| Parameter | Value |
|---|---|
| Regions | 12 |
| Plants per region | 6 |
| Total plants | 72 |
| Capacity per plant | 1 t/day |
| Total capacity | 72 t/day |
| Annual processing volume (350 days) | ~25,200 t/year |
6.3. Environmental Effect
Processing ~25,000 t/year of waste oil instead of burning/discharging reduces PM/PM-10, NOx, SO₂, and CO₂ emissions, prevents oil from entering soil and water, and reduces pressure on groundwater.
7. Brief Calculation for All of Uzbekistan
The calculation fully coincides with Section 3, since 125,000 t is already the national estimate of the burning stream.
8. Recommendations for Companies (Short-Term, 0–12 Months)
- Greenhouse farms and boiler houses: install particulate/gas filters; stop burning waste oil, tires, bitumen, and fuel oil; conclude contracts for waste oil removal.
- Collectors and processors: organize oil collection points; implement pre-treatment; launch pilot mini-plants.
- Service and transport companies: hand over waste oil only under contract; maintain records.
- Investors and mini-plant operators: replicate modular plants according to the scheme; ensure pre-treatment.
9. Limitations and Caveats
- This calculation is not official and cannot be used for legal claims.
- Emission factors are taken from international reference books, not from measurements.
- The 50/30/20 balance hypothesis is an estimate.
- Damage from discharge to groundwater is not calculated due to lack of monitoring data.
10. Next Steps (Internal)
- Request actual collection volumes from Uz-Prista Recycling for 2020–2025.
- Initiate field measurements of emissions from greenhouse boilers.
- Conduct soil and groundwater sampling in areas of mass burning.
- Launch a pilot mini-plant (1 t/day) and measure actual biodiesel yield.
11. Official Inspections & Media Coverage (Context)
October 2026 — National Committee on Ecology and Climate Change: Disciplinary Actions
An expanded meeting chaired by Aziz Abdukhakimov criticized deficiencies in environmental control. Heads of the Andijan, Namangan, and Khorezm regional ecology departments were dismissed.
Source: Hukumat.uz →October 2026 — Illegal Wastewater Discharge in Tashkent Region
Environmental Police raids in Yukorichirchiq District found enterprises discharging untreated industrial wastewater onto open land.
Source: Hukumat.uz →October 2026 — Chirchiq River Pollution (Red Water Incident)
Inspections at the Chirchiq treatment plant revealed treatment efficiency of only 27.7%. Untreated wastewater was discharged directly into the river.
Source: Hukumat.uz →July 2026 — Salar Canal Sewage Discharge
A damaged sewer pipeline led to 63,936 m³ of liquid waste being pumped into the Salar Canal. Total environmental compensation: UZS 2.22 billion.
Source: Gov.uz →Signed: "EcoAudit-Central Asia" Group
"We count what others don't"