Waste Oils — Uzbekistan

Preliminary environmental assessment of emissions and damage from burning waste oils in boilers and greenhouses.

Prepared byEcoAudit-Central Asia
Date14 November 2026
StatusPreliminary
For Internal Official Use Only

1. Basis and Objective

This report has been prepared on the basis of:

Purpose: to provide an order-of-magnitude damage estimate where official calculations are absent, and to propose short-term solutions.

2. Initial Balance Hypothesis (Working Assumption)

StreamShareMass, t/year
Burning (boilers, greenhouses, illegal)50%125,000
Discharge to soil/water/sewer30%75,000
Unaccounted collection (unknown location)20%50,000
Total100%250,000
Caveat: This is an estimated hypothesis, not confirmed by official collection statistics.

3. Emission Calculation from Burning 125,000 t of Oil

PollutantEmission FactorEmissions, t/year
CO₂2.9 t/t oil362,500
PM (particulate matter)~8.55 kg/t~1,069
PM-10~7.56 kg/t~945
NOx~2.11 kg/t~264
SO₂ (at S=1%)~0.143 kg/t~18
CO~0.278 kg/t~35
Lead (at 0.1% Pb)~0.0067 kg/t~0.84

4. Damage Assessment (International Rates)

4.1. Burning

ComponentLower EstimateUpper Estimate
CO₂ (market $21/t → SCC $1,013/t)~$7.6M~$367M
PM/PM-10 (EPA $150,000–840,000/t)~$142M~$794M
NOx (EPA $5,800–20,000/t)~$1.5M~$5.3M
Total Burning~$151M~$1.17B

4.2. Discharge of 75,000 t to Soil/Water

There are no direct international "tariffs." The lower bound based on soil treatment cost (~$1/t) is ~$75,000, but this does not account for groundwater migration or health impacts.

4.3. Unaccounted 50,000 t

Not assessed. Conservatively, this could be attributed to burning or discharge, increasing the total by 20–40%.

5. Summary Conclusion on Damage

ScenarioDamage Estimate (Burning)
Lower bound~$150M
Upper bound~$1.2B
Discharge to soil/waterNot determined (no data)
Even the lower bound demonstrates a scale of damage that is orders of magnitude higher than the cost of installing filters and organizing collection.

6. Short-Term Solutions

6.1. Conversion to Biodiesel with Pre-Treatment

Waste oil, after pre-treatment (filtration, removal of water and mechanical impurities, neutralization), can be processed into biodiesel.

6.2. Mini-Plant Deployment Scheme

ParameterValue
Regions12
Plants per region6
Total plants72
Capacity per plant1 t/day
Total capacity72 t/day
Annual processing volume (350 days)~25,200 t/year

6.3. Environmental Effect

Processing ~25,000 t/year of waste oil instead of burning/discharging reduces PM/PM-10, NOx, SO₂, and CO₂ emissions, prevents oil from entering soil and water, and reduces pressure on groundwater.

Note: 25,000 t is about 10% of total oil generation (250,000 t) and about 20% of the burning stream (125,000 t).

7. Brief Calculation for All of Uzbekistan

The calculation fully coincides with Section 3, since 125,000 t is already the national estimate of the burning stream.

8. Recommendations for Companies (Short-Term, 0–12 Months)

  1. Greenhouse farms and boiler houses: install particulate/gas filters; stop burning waste oil, tires, bitumen, and fuel oil; conclude contracts for waste oil removal.
  2. Collectors and processors: organize oil collection points; implement pre-treatment; launch pilot mini-plants.
  3. Service and transport companies: hand over waste oil only under contract; maintain records.
  4. Investors and mini-plant operators: replicate modular plants according to the scheme; ensure pre-treatment.

9. Limitations and Caveats

  1. This calculation is not official and cannot be used for legal claims.
  2. Emission factors are taken from international reference books, not from measurements.
  3. The 50/30/20 balance hypothesis is an estimate.
  4. Damage from discharge to groundwater is not calculated due to lack of monitoring data.

10. Next Steps (Internal)

  1. Request actual collection volumes from Uz-Prista Recycling for 2020–2025.
  2. Initiate field measurements of emissions from greenhouse boilers.
  3. Conduct soil and groundwater sampling in areas of mass burning.
  4. Launch a pilot mini-plant (1 t/day) and measure actual biodiesel yield.

11. Official Inspections & Media Coverage (Context)

October 2026 — National Committee on Ecology and Climate Change: Disciplinary Actions

An expanded meeting chaired by Aziz Abdukhakimov criticized deficiencies in environmental control. Heads of the Andijan, Namangan, and Khorezm regional ecology departments were dismissed.

Source: Hukumat.uz →

October 2026 — Illegal Wastewater Discharge in Tashkent Region

Environmental Police raids in Yukorichirchiq District found enterprises discharging untreated industrial wastewater onto open land.

Source: Hukumat.uz →

October 2026 — Chirchiq River Pollution (Red Water Incident)

Inspections at the Chirchiq treatment plant revealed treatment efficiency of only 27.7%. Untreated wastewater was discharged directly into the river.

Source: Hukumat.uz →

July 2026 — Salar Canal Sewage Discharge

A damaged sewer pipeline led to 63,936 m³ of liquid waste being pumped into the Salar Canal. Total environmental compensation: UZS 2.22 billion.

Source: Gov.uz →

Signed: "EcoAudit-Central Asia" Group

"We count what others don't"